description: Independent real estate construction firm, STRUCTR Advisors, used Reconstruct to identify a misplacement of sleeves prior to a large concrete pour for a structural slab. Realizing the error, they were able to make the necessary changes prior to concrete, preventing at least $17,000 in rework and multi-day delay in schedule.
image: https://blog.reconstructinc.com/hubfs/stemmmm.jpg
---

[Skip to content](https://blog.reconstructinc.com/case-studies/structr-advisors-uses-reconstruct-for-full-project-visibility-to-avoid-a-17000-concrete-rework#main-content)

# STRUCTR Advisors uses Reconstruct for Full Project Visibility to Avoid a $17,000 Concrete Rework

[ Reconstruct ](https://blog.reconstructinc.com/case-studies/author/reconstruct)

Independent real estate construction firm, [STRUCTR Advisors](https://structradvisors.com/), used Reconstruct to identify a misplacement of sleeves prior to a large concrete pour for a structural slab. Realizing the error, they were able to make the necessary changes prior to concrete, preventing *at least* $17,000 in rework and multi-day delay in schedule.

Location: Somewhere in Virginia

---

October 2022

---

Delivery method: Design–Build

---

Size: Big, really big

---

Planned Finish: Yesterday

"This is a great example of how we’re able to leverage this technology to do a quick scan of a slab to give the team time to react and correct the deviations and get everything in the right spot before the team poured concrete. It saved a lot of time, money, and potential quality issues with having to core drill the slab after the fact.”

**  
Kyle Jacocks**  
Virtual Construction Manager at STRUCTR Advisors

## The Problem

STRUCTR Advisors’ crew were hard at work developing Virginia Commonwealth University’s [newest STEM building](https://structradvisors.com/insights/case-study-alternative-fill-vcu-stem/). Prior to using Reconstruct, the team relied on drone footage and photography for mapping their construction sites. This method, while cheap to implement, was costly when mistakes arose, as visibility for potential errors was low. They knew they needed to use all the tools on their belt for this particular project to keep it moving.

 

## The Solution

As the team was preparing to lay structural concrete, they decided to take a scan of the space using Reconstruct. Using their already owned drone, they were able to capture where the rebar layouts and sleeve MEP penetrations were for the slab. Taking that reality and overlaying it with the 3D point cloud that's generated from the photo, they realized that the sleeves did not match up to the plan, which momentarily halted further work in that area.

 

## The Results

This realization gave the team an opportunity to reassess. They were able to speak with the field team and come up with a proactive solution prior to pouring of the concrete. The misplaced sleeves were reset, allowing overlays to match up. The team was able to proceed with concrete pouring knowing there wouldn’t need to be rework, which would have been incredibly costly, resulting in a $17,000 fee and hours of rework costs, setting the project behind time. All of this was avoided due to one Reconstruct capture.

 

---

 

 

## Related Content

![360-BIM-Overlay-1-still](https://blog.reconstructinc.com/hubfs/360-BIM-Overlay-1-still.jpg)

#### [Remote Quality Control: The Secret to Avoiding Costly Rework](https://blog.reconstructinc.com/remote-quality-control-the-secret-to-avoiding-costly-rework)

Optimal remote quality control of construction projects prevents costly rework. Reality mapping ensures remote teams catch quality issues faster than before.

[Read More](https://blog.reconstructinc.com/remote-quality-control-the-secret-to-avoiding-costly-rework)

![Screen Shot 2022-06-14 at 1.06.32 PM](https://blog.reconstructinc.com/hubfs/Screen%20Shot%202022-06-14%20at%201.06.32%20PM.png)

#### [ESI Group USA Saves Travel Time and Rework Costs with Reconstruct](https://info.reconstructinc.com/webinar-esi-case-study)

Join ESI Group USA and Reconstruct as they walk us through ESI's recent project on US Foods, and how Reconstruct helped their team save time and rework costs.

[Learn More](https://info.reconstructinc.com/webinar-esi-case-study)

![emile-guillemot-a333ixMpr68-unsplash](https://blog.reconstructinc.com/hubfs/emile-guillemot-a333ixMpr68-unsplash.jpg)

#### [Demystifying Reality Capture: How To Choose The Right Approach For Your Project ](https://blog.reconstructinc.com/webinars/on-demand-webinar-demystifying-reality-capture)

Navigating reality capture made easy with Reconstruct! Watch this webinar for insights on choosing the perfect approach for your construction project.

[Watch Now](https://blog.reconstructinc.com/webinars/on-demand-webinar-demystifying-reality-capture)

 

 

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Reconstruct",
    "url" : "https://blog.reconstructinc.com/case-studies/author/reconstruct"
  },
  "dateModified" : "2024-01-26T03:54:16.284Z",
  "datePublished" : "2023-07-13T21:33:16.000Z",
  "headline" : "STRUCTR Advisors uses Reconstruct for Full Project Visibility to Avoid a $17,000 Concrete Rework",
  "image" : [ "https://blog.reconstructinc.com/hubfs/stemmmm.jpg" ],
  "mainEntityOfPage" : {
    "@id" : "https://blog.reconstructinc.com/case-studies/structr-advisors-uses-reconstruct-for-full-project-visibility-to-avoid-a-17000-concrete-rework",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject"
    },
    "name" : "Reconstruct"
  }
}
```